Permits to work, gas tests and tank data off paper registers. Oil and gas operations are hazardous, heavily regulated and run around the clock across refineries, pipelines, terminals, depots and retail outlets. Plant data lives in DCS, SCADA and historians, while permits, inspections and incidents are often still on paper. Software fits in the gap between the control room and the business: safety workflows, asset integrity, terminal operations and the reports OISD and PNGRB expect.

  • Refineries and petrochemical complexes
  • Oil and gas pipeline operators
  • City gas distribution networks
  • Marketing terminals, depots and tank farms
  • Fuel retail and LPG distribution
  • Oilfield services and upstream contractors
A large oil refinery plant with columns and a network of pipelines

The pressure points

What slows oil and gas teams down

Paper permit to work
Hot work, confined space and electrical isolation permits are filled, signed and closed on paper. Simultaneous operations and isolations are hard to see across a unit.
Integrity data is scattered
Thickness readings, cathodic protection surveys, ILI runs and inspection reports sit in different files, so risk based inspection plans go stale.
Control room data stays in the control room
Historian and SCADA data rarely reaches planning, maintenance or management except as a daily Excel export.
Audit and incident records are slow to assemble
OISD audits and incident investigations mean days of finding records, near miss reports and action closure evidence.

Built for this sector

Systems specific to oil and gas

The work that generic software does not cover, and where most of the value sits.

Digital permit to work
Permit types, gas test records, isolation certificates, approvals by role, SIMOPS conflict checks and handover between shifts, on tablets rated for the area.
Pipeline integrity management
ILI, CP survey and patrol data on a GIS route, with anomaly assessment, dig plans and risk ranking in line with API 1160 practice.
HSE incident management
Near miss and incident reporting from the field, investigation workflow with root cause, CAPA tracking and statutory reporting.
Terminal and tank farm automation
Tank gauging, receipt and dispatch, bay queue management, loading against orders and stock reconciliation with the ERP.
SCADA and historian integration
Read-only links from PI, DCS and SCADA through a DMZ, so dashboards and maintenance use live readings without touching control systems.

Where AI helps

AI use cases with a clear return

  1. Standards and SOP assistant

    Answers questions from OISD standards, plant SOPs and past audit findings, citing the clause, for engineers and safety officers.

    Answers in minutes from the manuals

  2. Rotating equipment early warning

    Learns normal behaviour of pumps and compressors from vibration, temperature and pressure readings and flags drift for the reliability engineer.

    More failures caught early as planned work

  3. Permit risk checks

    Reviews a draft permit against simultaneous jobs, isolations and gas test results and points out conflicts before approval.

    Conflicting jobs are caught before work starts

  4. Inspection report reading

    Extracts findings, thickness readings and due actions from inspection and audit reports into the integrity and compliance registers.

    Overdue recommendations become visible

  5. Fuel demand forecasting

    Forecasts product demand by depot and retail outlet to plan replenishment and tank truck schedules.

    Fewer dry-outs at outlets and better truck use

What your team would see

Terminal and HSE overview
Illustrative
Active permits
46
Days since last LTI
312
Audit recommendations overdue
11
Tank trucks loaded today
184

Near miss reports per week

Near miss reports per week, point 1: 18Near miss reports per week, point 2: 22Near miss reports per week, point 3: 19Near miss reports per week, point 4: 26Near miss reports per week, point 5: 24Near miss reports per week, point 6: 29Near miss reports per week, point 7: 31Near miss reports per week, point 8: 28Near miss reports per week, point 9: 33Near miss reports per week, point 10: 30Near miss reports per week, point 11: 34Near miss reports per week, point 12: 32

Inspection plan completion by equipment class

  • Storage tanks82
  • Pressure vessels91
  • Pipelines74
  • Relief valves88
  • Rotating equipment69

A sample of the kind of dashboard we build for this sector. Figures are illustrative.

Connects with

  • SAP PM and MM
  • AVEVA PI and other historians
  • SCADA and DCS (read only)
  • Automatic tank gauging
  • GIS platforms
  • Vehicle tracking systems
  • Fire and gas detection panels
  • Terminal automation systems

Rules we design for

Before you start

Oil and Gas: common questions

Will you connect to our control systems?

Only read-only, through your DMZ or historian, with your OT security team's approval. We never write back to DCS or SCADA from business software.

Can a digital permit work in hazardous areas?

Yes, on intrinsically safe or zoned tablets your site already approves, with offline mode for areas with poor coverage and a paper fallback procedure.

We run SAP. Why build anything?

SAP stays the record for maintenance and materials. We build the field facing pieces SAP does poorly, such as permits, incident reporting and terminal operations, and post results back into SAP.

Talk to us

Working in oil and gas?

Tell us which process hurts most. Someone who knows the sector will reply with two or three options and rough hours.

All industries
Timeline

Start a conversation

Tell us what you are trying to build.

Share the problem in a short call. You leave with a clear view of the approach, the team and the cost.

Or get a ballpark proposal in two minutes

A specialist replies within one working day. The first conversation is free.